The equipment is an auxiliary production equipment for bar reinforcement to realize the batch size cutting of bars, easily meet the matching of subsequent bending circle, bending arc, bending hoop and other procedures that require the size of bars, widely used in construction, highway, high-speed rail, tunnel, water conservancy, nuclear power plant and other industries.




Video
Parameters
|
Bar diameter (mm) |
10 |
12 |
16 |
20 |
22 |
25 |
28 |
32 |
35 |
38 |
|
Shear bar quantity(HRB400) |
10 |
8 |
6 |
4 |
3 |
3 |
2 |
1 |
1 |
1 |
|
Shear frequency |
20 times/min |
|||||||||
|
Effective blade width |
200mm |
|||||||||
|
Bar transfer speed |
50m/min |
|||||||||
|
Shearable bar length |
750~12000mm |
|||||||||
|
Size error |
±5mm |
|||||||||
|
Minimum manual shear size |
750mm |
|||||||||
|
Minimum automatic shear size |
1200mm |
|||||||||
|
Bar diameter |
Φ10~38mm |
|||||||||
|
Shear line total power |
14KW Including air compressor |
|||||||||
|
Bar receiving bin |
3*2 |
|||||||||
|
Average power consumption |
8KW/H |
|||||||||
|
Total air consumption |
1m³/min |
|||||||||
|
Equipment floor space |
26m×3.2m×1.5m |
|||||||||
Operating Quality Procedure
1. Before the operation of the steel bar shear line, the appropriate blade specifications and models should be selected as required.
2. Before operation, the blade should be adjusted and calibrated to ensure that the cutting quality meets the requirements.
3. A stable cutting speed and rhythm should be maintained during the operation to avoid burrs or damage.
4. After each cutting, the residue of the cutting part should be cleaned in time to keep the cutting line clean.
5. After the shear line operation is completed, the equipment should be regularly maintained and maintained to ensure its normal working condition.

Efficiency Improvement Procedures
1. Before cutting the steel bar, prepare the required steel bars and other auxiliary tools in advance.
2. During operation, the cutting order should be arranged reasonably, and the cutting path should be optimized to improve the operation efficiency.
3. In the process of operation, attention should be paid to the reasonable allocation and utilization of human resources to avoid waste or duplication of labor.
4. Try to use mechanized equipment and automated processes to improve the efficiency and quality of operations.
5. After the cutting line operation is finished, the experience should be summarized in time to find out the shortcomings and make improvements.